Investment architectureConcept · Bangladesh · multi-crop system

Design the service before fixing the cold room.

Map useful demand, compare handling and cooling options, and identify the smallest viable first investment.

Immediate mandate
Map the public and private pipeline, measure capacity-days, test operator economics and issue a first-cluster mandate.Explore the Capacity Calendar
Scroll to test the system ↓
The system question

Where can post-harvest control preserve enough value and sell enough capacity-days to justify investment?

A viable case needs repeatable crop flow, measurable value preservation, accountable operation and a gap that existing or planned facilities will not fill.

01 · Demand

Is the service needed often enough?

Measure loads, seasons, routes and required dwell.

02 · Value

Does control preserve commercial value?

Compare handling and cooling against current practice.

03 · Operation

Can an operator keep it turning?

Test uptime, maintenance, collections and utilisation.

04 · Additionality

Does investment fill a real gap?

Verify public, private and announced capacity first.

Current-system baseline

Map the route, public pipeline and useful service gap before designing a network.

Join crop movement, current handling, facilities, announced assets, buyers and payment into one baseline.

Aug 2025100 farmer units launched
Jan 2026Further units entered procurement
Jun 20262,000-unit intention announced
Jul 2026Solar network ambition announced

Additionality test Proceed only where crop, service, operating or market gaps remain demonstrably unserved.

01

Production clusters

Seasons, loads and aggregation.

Useful demand begins
02

Current route

Handling, waiting, movement and settlement.

No-new-asset baseline
03

Available capacity

Operating status, radius and compatibility.

Capacity actually available
04

Planned pipeline

Ownership, timing and intended users.

Future overlap
05

Buyer routes

Windows, acceptance, rejection and payment.

Value at destination
Signature investment instrument

The Capacity Calendar.

Plot seasonal overlap and idle-capacity risk. Illustrative crop bands will be replaced with verified cluster, volume and buyer records.

Planning discipline: field evidence replaces every illustrative crop band.

Six-stage operating sequence

From booking to settlement.

Follow one booked load from intake to accepted product, service fee and settlement.

Produce lots gathered for intake review
01 · Receive

Book the load before capacity is promised.

The service begins with crop identity, quantity, arrival window, destination and the treatment the route may require.

Responsible actorBooking lead and node operator
Service or energyWeighment, intake and booking record
Evidence requiredArrival pattern, load truth and named destination
Value questionCan the node sell a useful capacity-day?
Booked-load sequenceBooked intake

Receive stage active.

Evidence campaign

Four linked records test every network response.

One baseline joins flow, condition, capacity and accountability across crops, seasons and sites.

01 · Flow

Load and route

Season, cluster, volume, buyer and arrival window.

02 · Condition

Time and treatment

Waiting, packaging, temperature, handling and response.

03 · Capacity

Use and economics

Turns, downtime, energy, labour and net value.

04 · Accountability

Responsibility and payment

Scheduling, custody, fee, settlement and data ownership.

SellNamed service offerScheduleBooked capacityMaintainUptime and protocolSettleFees and payment
Solar-powered irrigation equipment beside cultivated land
Adjacent rural-energy context · not cold-chain evidenceInstallation is possible. The question is whether a useful service can be booked, operated and paid for.
Network alternatives

One baseline. Four responses. Equal appraisal.

Demand, value, operation, lifecycle cost and additionality are assessed on the same terms.

Baseline · Current route

Current practice

Measure handling, waiting, movement, storage and settlement without a new intervention.

Purpose
Establish the counterfactual.
A · Handling-led response

Faster, cooler movement

Use shade, crates, grading, scheduling and buyer coordination before adding storage.

Advance when
Coordination explains most avoidable loss.
B · Distributed cooling

Small services near production

Serve repeatable crop-specific loads within a limited radius.

Advance when
Local delay is material and capacity-days sell.
C · Clustered network

Collection linked to shared nodes

Consolidate local loads into regionally connected treatment and storage.

Advance when
Coordination benefits exceed added handoffs.
D · Regional platform

Hub-and-spoke across crops

Combine diverse calendars, confirmed buyers and multi-route dispatch.

Advance when
Throughput supports complex operation.
Capacity-day scenario laboratory

Test utilisation before choosing revenue or capital.

Adjust capacity, occupancy, uptime and dwell to expose useful service and idle capacity, then verify the commercial records needed for pricing and finance.

To verifyDesign capacity
To verifyUtilisation case
HeldEconomics for validation
10 tonnes
55%
90%
2 days
Occupied capacity-days / month149

Capacity × days × occupancy × uptime.

Indicative completed turns7.4

Operating window ÷ dwell, adjusted for use.

Unfilled capacity-days151

Capacity still needing another crop or route.

Commercial case held for validationRevenue and capital remain unassigned

Verify tariff, energy, labour, maintenance, transport, rejection, payment delay, farmer value and replacement reserve before selecting a financing response.

Investment gates

Four gates before any asset advances.

Definitions and weights are agreed before scoring, then tested under downside, base and high-utilisation cases.

GateProceed whenPrimary record
Useful demand and value

Repeatable loads and treatment preserve condition, acceptance or price.

Calendar and treatment comparison
Proportionate network

The option outperforms current practice and smaller responses.

Equal alternatives appraisal
Viable operation

Contribution, uptime, staffing, collections and maintenance are credible.

Capacity-day and operator model
Additional and financeable

The service fills a verified gap and risk allocation is proportionate.

Infrastructure map and financing plan
Current mandate

Build the evidence before the network.

Map useful demand, compare proportionate responses and structure the smallest viable first investment.

  1. 01Map and measureService gap, loads, condition and payment
  2. 02Model and compareCapacity-days, lifecycle cost and alternatives
  3. 03Structure and mandateOperator, finance and smallest viable response
Evidence first

Grant or study funding for mapping, measurement and an open decision record.

Pilot when verified

Results-linked or concessional capital where bookings and service economics are credible.

Asset finance later

Lease, debt, guarantee or procurement only after lifecycle cost and risk allocation are demonstrated.

Evidence notes

Public pipeline: 2025–26 launches, tenders and announcements indicate strong national momentum. They do not prove operating status, utilisation or commercial sustainability; field mapping must verify each facility.

Sustainable-cooling hierarchy: World Bank guidance prioritises demand reduction, efficiency and system-level business models before expanding supply.

Cold-chain constraints: IFC links weak business models, financing, electricity and fragmented routes. Cooling-as-a-service remains one model to test, with mixed reported scaling outcomes.

Capacity case unresolved · Current decision

Test the operating calendar before fixing capital.

Map demand, compare smaller responses and identify the smallest viable first intervention, pilot or no-build outcome.